excel expert
Project detail
2. The purpose of this project is to generate an excel sheet which contains the combination of elective courses in the second year that can be scheduled in the time table in parallel.
3. Consider there are 200 students in the second year. For live data on the list of elective courses being run and the students in each of the courses, get in touch with the time table coordinator.
4. The criterion for the project is that two courses with a few students in common cannot be run at the same time.
5. Assume that there are only three rooms for running the elective courses. Hence the combinations derived should not include more than 3 courses at a given time.
6. The combinations should change automatically in case students shift from one elective to another.
7. Also, the sheet should be able to accommodate more or less number of elective courses as compared to the elective courses running currently.