Need NYC PE Engineer
Project detail
Damaged building. DOB partially rescinded. Full vacate order to allow tenants to remove their belongings. NYC PE is required to supervise and be present on site during this time. Starts Monday 2/7 ending Friday 2/18. Posted price below is random and to be discussed. Costs covered by property insurance and payable right away.